The Broughs, Bracknell
The Broughs consisted of the demolition of a single vacant detached dwelling and the construction of a flatted scheme.
The Broughs, Bracknell Read More »
The Broughs consisted of the demolition of a single vacant detached dwelling and the construction of a flatted scheme.
The Broughs, Bracknell Read More »
Refurbishment of existing building and change of use from offices to 9 flats.
The Castle Suite, Farnham Read More »
The conversion of existing offices into 1 and 2 bedroom flats. The project included removal of the roof and addition of a new floor to provide 2 Penthouse Flats.
Blades Court, London Read More »
Minor alterations to the Ground Floor Retail Unit, conversion of the First, Second and Third floors to provide Apartments.
Ward Street, Guildford Read More »
Conversion of existing office building to provide a gym facility (shell only) and 24 studios/flats
Friar’s Walk, East Sussex Read More »
The former Sewage Treatment Works Site extends to 4 hectares, and known to have been decommissioned between the mid 1990s and early 2000s.
Stafferton Lane, Maidenhead Read More »
Demolition of existing buildings and redevelopment of the site to provide 229 residential units and 789sq/m of affordable workspace.
Watkin Road, London Read More »
Development of two buildings comprising 149 apartments and 2,400 sq/m of commercial space.
Bollo Lane, London Read More »
Demolition of the existing Battersea Christian Centre and the construction thereon of a new mixed-use building.
Battersea Bridge Road, London Read More »
Delivery of 218 Affordable dwellings including 213 Apartments and 5 two storey Townhouses on behalf L&Q, on their Citroen Development in Brentford.