Harmans Cross, Valley Road
The project comprises the design and construction of 3nr luxury 4 bedroom houses built into a steep sloping site including formation of private road, associated landscaping and services.
Bennington Green were appointed to provide full monitoring surveying services on behalf of the Fund. The services included a full project review including commentary on build cost, form of contract, statutory requirements, selection of design and construction team, pre-construction surveys, site risks etc. with the aim of quantifying risk to the Fund. We were also appointed to provide construction phase monitoring services which included reconciliation of monthly drawdowns as well as continuing to update the Fund on the ongoing risk.
Download Case Study
Bournemouth
The Pagoda,
30 Avenue Road,
Bournemouth,
Dorset,
BH2 5SL
+44 (0) 1202 766584
London
107-111 Fleet Street,
London,
EC4A 2AB
+44 (0) 207 183 8520
Southampton
Cumberland Place,
Southampton,
SO15 2BG
+44 (0) 238 129 0228
Thatcham
Bank House,
13-15 High Street
Thatcham
RG19 3JG
+44 (0) 1635 872000
SocialĀ Media