Harewood College Case Study | Project Management and Party Wall Specialists | Bennington Green
1860
page-template,page-template-full_width,page-template-full_width-php,page,page-id-1860,page-child,parent-pageid-501,do-etfw,ajax_fade,page_not_loaded,,qode-child-theme-ver-1.0.0,qode-theme-ver-1.0.0,wpb-js-composer js-comp-ver-4.12,vc_responsive

Harewood College

Bennington Green Location

Location

Bournemouth

Sectors at Bennington Green

Sector

Education

project management

Main Expertise

Project Management

Harewood College

The works involved the relocation of the entrance to the school. This began with the demolishing of the existing reception area canopy, partial removal of the external wall of the existing main building and build an extension including remodelling of the internal layout. The section of works included the stripping back of the existing roof covering and replacing it.

Download Case Study

benningtongreen


 

Bournemouth


 

The Pagoda,
30 Avenue Road,
Bournemouth,
Dorset,
BH2 5SL
+44 (0) 1202 766584

London


107-111 Fleet Street,
London,
EC4A 2AB
+44 (0) 207 183 8520

Southampton


Cumberland Place,
Southampton,
SO15 2BG
+44 (0) 238 129 0228

Newbury


Oxford House, 12-20 Oxford Street,

Newbury,

Berkshire,

RG14 1JB

+44 (0) 1635 872000

Social  Media