Canterbury House, Birmingham
Bennington Green were required to prepare a programme to incorporate the client’s timescales to complete this project in a very short period of time. We prepared a programme identifying the order of demolition through to construction of independent studio, one and two bed apartments. We also prepared a construction phase health & safety plan in order that the contractor could undertake the works safely and in accordance with the CDM 2015 Regulations. We coordinated architectural, structural and M&E services in order to complete the project on time.
Bennington Green provided a review of the JCT 2011 Design & Build contract to ensure that the client was aware of potential clause penalties.
The project came in within budget.
Download Case Study
Bournemouth
The Pagoda,
30 Avenue Road,
Bournemouth,
Dorset,
BH2 5SL
+44 (0) 1202 766584
London
107-111 Fleet Street,
London,
EC4A 2AB
+44 (0) 207 183 8520
Southampton
Cumberland Place,
Southampton,
SO15 2BG
+44 (0) 238 129 0228
Newbury
Oxford House, 12-20 Oxford Street,
Newbury,
Berkshire,
RG14 1JB
+44 (0) 1635 872000
Social Media
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
Download Case Study
Bournemouth
The Pagoda,
30 Avenue Road,
Bournemouth,
Dorset,
BH2 5SL
+44 (0) 1202 766584
London
107-111 Fleet Street,
London,
EC4A 2AB
+44 (0) 207 183 8520
Southampton
Cumberland Place,
Southampton,
SO15 2BG
+44 (0) 238 129 0228
Newbury
Oxford House, 12-20 Oxford Street,
Newbury,
Berkshire,
RG14 1JB
+44 (0) 1635 872000
Social Media